Underground Storage Tank (UST) Removal
USTs are removed according to the following:
-
Title 22 CCR 66261
-
Identification and Listing of Hazardous Waste,Title 22 CCR 66273
-
Standards for Universal Waste Management, 40 CFR 112
-
Oil Pollution Prevention, 49 CFR 172
Gas Station Demolition
Gas station demolitions are performed according to the following:
-
Title 14 CCR 17387 Construction & Demolition Waste & Debris Disposal Regulatory Requirements
Clarifier & Underground Hoist Removal
Underground hydraulic hoists consist of a ram and hydraulic oil reservoir that of which can become potential environmental hazardous if oil is released into the subsurface. Hoist removal process is site specific, such as that listed below but not limited to:
-
Excavation of concrete, soil, and debris in the vicinity of the lift
-
Extraction of hydraulic oil from reservoir and ram
-
Backfilling and compaction of excavated area with proper material
-
Transportation of waste generated to certified facility
-
Closure report
Clarifiers are settling tanks built with mechanical means for continuous removal of solids being deposited by sedimentation. Removal of clarifiers are site specific, such as that listed below but not limited to:
-
Excavation of concrete, soil, and debris in the vicinity of the clarifier
-
Extraction of clarifier
-
Backfilling and compaction of excavated area with proper material
-
Transportation of waste generated to certified facility
-
Closure report